Samsung DV365ETBGSF/A1 User Manual Ver.02 (English, French, Spanish) - Page 18
DV365_03064C-03_EN.indd Sec11:18, 08:15
View all Samsung DV365ETBGSF/A1 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 18 highlights
installing your dryer 6. Review the Electrical Requirements section, then follow the 3 Wire system connection instructions (Step 7) or 4 Wire system instructions (Step 8) below. Three Wire System B W R 7. Three Wire system instructions: a. Loosen or remove the center terminal block screw. b. Connect the neutral wire (white or center wire) of the power cord to the center, silver-colored terminal screw of the terminal block. Tighten screw. c. Connect the other wires to outer terminal block screws. Tighten screws. d. Tighten the strain relief screws. 1. External ground connector e. Insert the tab of the terminal block cover into your dryer's rear 2. Neutral grounding wire panel slot. (green/yellow) from dryer f. Secure the cover with a hold-down screw. g. BEFORE OPERATING OR TESTING, follow the grounding instructions in the Grounding section. wiring harness 3. Center silver-colored terminal block screw 4. Neutral wire (white or center If converting from a 4-wire electrical system to a 3-wire, wire) from power cord. WARNING you must connect the ground strap to the terminal block 5. 3/4" (1.9 cm) UL listed support to ground the dryer frame to the neutral conductor. strain relief We recommend using Ring terminals. If you use Strap terminals, please ensure you install them perfectly. B - Black, W - White, R - Red 8. Four Wire System instructions: a. Remove the center terminal block screw. b. Connect the ground wire (green or unwrapped) of the power cord to the external ground conductor screw. c. Connect the neutral wire (white or center wire) of the power cord and the appliance ground wire (green with yellow stripes) under the central screw of the terminal block. d. Connect the other wires to the outer terminal block screws. Tighten screws. e. Tighten the strain relief screws. f. Insert the tab of the terminal block cover into your dryer's rear panel slot. g. Secure the cover with a hold-down screw. h. BEFORE OPERATING OR TESTING, follow the grounding instructions in the Grounding section. We recommend using Ring terminals. If you use Strap terminals, please ensure you install them perfectly. Four Wire System G B W R 1. External ground connector 2. Green or bare copper wire from power cord 3. 3/4 in. (1.9 cm) UL listed strain relief 4. Center silver-colored terminal block screw 5. Grounding wire (green/yellow) from dryer wiring harness 6. Neutral wire (white or center wire) from power cord B - Black, W - White, R - Red, G - Green 18_ installing your dryer DV365_03064C-03_EN.indd Sec11:18 2013-08-08 4:08:15