Samsung DVG45T6000W/A3 User Manual - Page 26
Installation, dryer frame to the neutral conductor at the terminal block.
View all Samsung DVG45T6000W/A3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Installation WARNING • All U.S. models are designed for a 3-wire system connection. The dryer frame is grounded to the neutral conductor at the terminal block. A 4-wire system connection is required for new or remodeled construction, mobile homes, or if local codes do not permit grounding through neutral. If you use the 4-wire system, you cannot ground the dryer frame to the neutral conductor at the terminal block. • Remove the terminal block cover plate. Insert the power cord with a UL-listed strain relief through the hole provided in the cabinet near the terminal block. • A strain relief must be used. Do not loosen the nuts already installed on the terminal block. Be sure they are tight. Use a 3/8" (1 cm) deep well socket. Installation 26 English Untitled-10 26 2020-07-14 3:22:15