Samsung NE63T8111SS/AA Installation Guide - Page 11
Step 4. Installing the conduit, Installing a 3-wire conduit
View all Samsung NE63T8111SS/AA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Step 4. Installing the conduit Remove the conduit connection plate and rotate it as shown below. The conduit hole (11⁄8") must be used. 11⁄8" 13⁄8" 13⁄8" 11⁄8" 1. Prepare the conduit cord as shown in Figure 1. 2. Install the conduit cord as shown in Figure 2. Figure 1 1" 3⁄8" 1" 3⁄8" Figure 2 Ring 31⁄2" 3 wire 31⁄2" 4 wire Body Strain relief Knockout surface Conduit connection plate For conduit installations, insert the strain relief (not included) into the conduit hole (11⁄8"). Then thread the conduit cord through the body of the strain relief and fasten the ring. Reinstall the bracket. Installing a 3-wire conduit • Aluminum building wire may be used but it must be rated for the correct amperage and voltage. Connect the wires as described below. • The wire you use, the location and enclosure of splices, etc., must conform to good wiring practices and local codes. 1. Loosen the 3 lower terminal screws from the terminal block. 2. Insert the center bare wire (white/neutral) tip through the bottom center terminal block opening. On certain models, the wire will need to be inserted through the ground strap opening and then into the bottom center block opening. 3. Insert the two side bare wire tips into the lower left and the lower right terminal block openings. 4. Tighten the screws until the wire is firmly secured (35 to 50 inch-lbs.). Do not over-tighten the screws since it could damage the wires. 5. Go to Step 5 on page 13 to continue with the installation. Ground strap White Black Red Neutral terminal Live 2 Live 1 White Black Red Wire tips Connecting the power Install_NE63T8911_AA_DG68-01257A-00_EN.indd 11 English 11 2020-03-26 6:27:51