Tripp Lite 9PX11KTF11M Eaton 9PX UPS 700-3000 VA 2U Owners Manual - Page 25

UPS connection without HotSwap MBP module

Page 25 highlights

ENGLISH 3. Installation 3.8 UPS connection without HotSwap MBP module Check that the indications on the name plate located on the back of the UPS correspond to the AC-power source and the true electrical consumption of the total load. 1. 9PX 2000RT / 3000RT : connect the UPS input socket 1 to the AC-power source. 9PX 2200GRT / 3000GRT / 3000GLRT: connect the supplied cable 15 (250 V - 16 A) to the socket 1 , then to the AC-power source. 57 6 1 2. C onnect the loads to the UPS using the cables 16 . It is preferable to connect the priority loads to the outlets marked 5 and the non-priority loads to the outlets marked 6 7 that can be programmed. Connect any high-power devices to the 16 A outlet. 15 16 19 To program shutdown of outlets 6 7 during operation on battery power and thus optimise the available backup time, please check the in/out settings. 3. For G models, fit the cable locking system 19 that prevents the plugs from being pulled out accidentally. 6 5 7 16 15 Note. The UPS charges the battery as soon as it is connected to the AC-power source, even if button is not pressed. Once the UPS is connected to the AC-power source, eight hours of charging are required before the battery can supply the rated backup time. 9PX 1-3 KVA US_EN Page 25

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46

Page 25
9PX 1-3 KVA US_EN
ENGLISH
3. Installation
3.8
UPS connection without HotSwap MBP module
Check that the indications on the name plate located on the back of the UPS correspond to the AC-power
source and the true electrical consumption of the total load.
15
1
16
19
7
6
5
1.
9PX 2000RT / 3000RT
: connect
the UPS input socket
1
to the
AC-power source.
9PX 2200GRT / 3000GRT /
3000GLRT
: connect the supplied
cable
15
(250 V - 16 A) to the
socket
1
, then to the AC-power
source.
2.
Connect the loads to the UPS
using the cables
16
.
It is preferable to connect the
priority loads to the outlets
marked
5
and the non-priority
loads to the outlets marked
6
7
that can be programmed.
Connect any high-power devices
to the 16 A outlet.
To program shutdown of outlets
6
7
during operation on battery
power and thus optimise
the available backup time,
please check the in/out settings.
3.
For G models, fit the cable locking
system
19
that prevents the plugs
from being pulled out accidentally.
Note.
The UPS charges the battery as soon as it is connected to the AC-power source, even if
button
is not pressed.
Once the UPS is connected to the AC-power source, eight hours of charging are required before the
battery can supply the rated backup time.
15
7
16
6
5