Vizio XMA1200 Quick Installation Guide - Page 14

Drill about 2 into the studs.

Page 14 highlights

7. Ensure the mount is level. Make any necessary adjustments, then 7 use a wrench to tighten the top 2 lag bolts. Ensure the bottom mount holes are over a stud. Using the power drill and the 7/32" drill bit, drill 2 holes in the bottom two mount holes. Drill about 2" into the studs. 1 2 8. Remove 2 lag bolts and 2 washers from the pouch labeled LAG. 8 Use a wrench to tighten the lag bolts and washers into the 2 holes you just drilled. Insert the lag bolts completely. The mount is attached to the wall. Go to Step 6 on page 16. 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

7. Ensure the mount is level. Make any necessary adjustments, then
use a wrench to tighten the top 2 lag bolts.
Ensure the bottom mount holes are over a stud. Using the power
drill and the 7/32” drill bit, drill 2 holes in the bottom two mount
holes.
Drill about 2” into the studs.
8. Remove
2 lag bolts
and
2 washers
from the pouch labeled
LAG
.
Use a wrench to tighten the lag bolts and washers into the 2
holes you just drilled. Insert the lag bolts completely.
The mount is attached to the wall.
Go to Step 6 on page 16.
7
8
1
2
12