Weider 9350 Instruction Manual - Page 13

Frame 55. Attach the Pulley inside the Top

Page 13 highlights

33. Wrap the Low Cable (69) under a 90mm Pulley 33 (15). Attach the Pulley and a pair of Pulley Covers (40) to the upper hole in the Front Upright (42) with an M10 x 115mm Bolt (102), an M10 Thick Spacer (104), an M10 Washer (9), and an M10 Nylon Locknut (21). Make sure the large tabs on the Pulley Covers are on the side shown. 40 104 15 69 9 102 Large Tab 21 40 42 34. Wrap the Low Cable (69) around a 90mm Pulley (15). Attach the Pulley and a pair of Pulley Covers (40) to the Press Frame (17) with an M10 x 135mm Bolt (75) and an M10 Thick Spacer (104). Make sure the small tabs on the Pulley Covers are on the side shown. Note: A nylon locknut will be attached to the bolt in step 36. 35. Wrap the Low Cable (69) around a "V"-pulley (6). Attach the "V"-pulley and a Long Cable Trap (50) to the second hole from the end of the tube on the Front Upright (42) with an M10 x 80mm Bolt (8), two M10 Washers (9), and an M10 Nylon Locknut (21). 34 69 17 Small Tab 104 40 15 40 75 35 42 21 69 9 50 6 9 8 36. Wrap the Low Cable (69) around a 90mm Pulley 36 (15). Attach the Pulley and a pair of Pulley Covers (40) to the Press Frame (17) with the M10 x 135mm Bolt (75) used in step 34 and an M10 Nylon Locknut (21). Make sure the small tabs on the Pulley Covers are on the side shown. 16 Small Tab 69 21 40 15 40 75 17 22. Locate the Weight Cable (23), which has a bolt 22 on each end. Attach the Cable to the Large "U"- bracket (90) with an M8 Washer (70) and an M8 Nylon Locknut (3). Do not completely tighten the Locknut; it should be threaded only two turns onto the end of the Cable, as shown in the inset drawing. 23. Wrap the Weight Cable (23) under a 90mm Pulley 23 (15). Attach the Pulley and a pair of Pulley Covers (40) to the Pulley Plates (58) with an M10 x 52mm Bolt (12) and an M10 Nylon Locknut (21). Make sure the small tabs on the Pulley Covers are on top. 24. Route the Weight Cable (23) up through the Top 24 Frame (55). Wrap the Cable around a 90mm Pulley (15). Attach the Pulley inside the Top Frame with an M10 x 78mm Bolt (76), two 17.5mm Spacers (77), two M10 Washers (9), and an M10 Nylon Locknut (21). 3 70 90 23 90 3 11 23 21 Small Tabs 58 40 15 40 58 12 55 15 77 23 77 76 9 21 9 25. Wrap the Weight Cable (23) around a 90mm 25 Pulley (15) and route it down through the Top Frame (55). Attach the Pulley inside the Top Frame with an M10 x 78mm Bolt (76), two 17.5mm Spacers (77), two M10 Washers (9), and an M10 Nylon Locknut (21). 23 15 76 77 55 77 9 21 9 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18

23. Wrap the Weight Cable (23) under a 90mm Pulley
(15). Attach the Pulley and a pair of Pulley
Covers (40) to the Pulley Plates (58) with an M10
x 52mm Bolt (12) and an M10 Nylon Locknut
(21).
Make sure the small tabs on the Pulley
Covers are on top.
21
12
23
40
15
40
58
58
23
22.
Locate the Weight Cable (23),
which has a bolt
on each end. Attach the Cable to the Large “U”-
bracket (90) with an M8 Washer (70) and an M8
Nylon Locknut (3).
Do not completely tighten
the Locknut; it should be threaded only two
turns onto the end of the Cable, as shown in
the inset drawing.
22
3
3
11
70
90
90
23
24. Route the Weight Cable (23) up through the Top
Frame (55). Wrap the Cable around a 90mm
Pulley (15). Attach the Pulley inside the Top
Frame with an M10 x 78mm Bolt (76), two
17.5mm Spacers (77), two M10 Washers (9), and
an M10 Nylon Locknut (21).
25. Wrap the Weight Cable (23) around a 90mm
Pulley (15) and route it down through the Top
Frame (55). Attach the Pulley inside the Top
Frame with an M10 x 78mm Bolt (76), two
17.5mm Spacers (77), two M10 Washers (9), and
an M10 Nylon Locknut (21).
24
25
23
15
21
77
77
76
55
9
23
9
15
76
77
77
21
55
9
9
16
13
33. Wrap the Low Cable (69) under a 90mm Pulley
(15). Attach the Pulley and a pair of Pulley
Covers (40) to the upper hole in the Front Upright
(42) with an M10 x 115mm Bolt (102), an M10
Thick Spacer (104), an M10 Washer (9), and an
M10 Nylon Locknut (21).
Make sure the large
tabs on the Pulley Covers are on the side
shown.
35. Wrap the Low Cable (69) around a “V”-pulley (6).
Attach the “V”-pulley and a Long Cable Trap (50)
to the second hole from the end of the tube on
the Front Upright (42) with an M10 x 80mm Bolt
(8), two M10 Washers (9), and an M10 Nylon
Locknut (21).
36. Wrap the Low Cable (69) around a 90mm Pulley
(15). Attach the Pulley and a pair of Pulley
Covers (40) to the Press Frame (17) with the M10
x 135mm Bolt (75) used in step 34 and an M10
Nylon Locknut (21).
Make sure the small tabs
on the Pulley Covers are on the side shown.
34. Wrap the Low Cable (69) around a 90mm Pulley
(15). Attach the Pulley and a pair of Pulley
Covers (40) to the Press Frame (17) with an M10
x 135mm Bolt (75) and an M10 Thick Spacer
(104).
Make sure the small tabs on the Pulley
Covers are on the side shown. Note: A nylon
locknut will be attached to the bolt in step 36.
33
34
35
36
Large
Tab
15
69
102
40
104
40
21
42
9
Small
Tab
75
40
40
104
17
15
69
42
69
50
6
9
8
21
9
Small
Tab
40
69
40
15
21
17
75
Small
Tabs