Weider Pro 340 English Manual - Page 11
Cable
View all Weider Pro 340 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
15. Slide the Weight Carriage (2) onto the Lat Tower 15 (1). The Weight Carriage must be turned as O shown. Slide the Carriage Stop (37) onto the Lat Tower (1). The 2 1/2" Square Bushing (58) must be facing the Weight Carriage (2). Align the holes in the Carriage Stop with the indicated hole in the Lat Tower. Attach the Carriage Stop to the Lat Tower with the M8 x 70mm Bolt (38) and an M8 Nylon Locknut (40). 1 16. Feed the Cable (36) through the indicated slot in the Lat Tower (1). Rest the Cable in the groove of a Pulley (35). Attach the Pulley to the Lat Tower with a 10mm x 75mm Bolt (50), two 10mm Washers (51), two 16mm Spacers (52), and a 10mm Nylon Locknut (49). Rest the Cable (13) in the groove of the other Pulley (35). Attach the other Pulley to the Lat Tower (1) with a 10mm x 75mm Bolt (50), two 10mm Washers (51), two 16mm Spacers (52), and a 10mm Nylon Locknut (49). The Cable must run smoothly over both Pulleys. Attach the Cable (36) to the M8 Eyebolt (39) by sliding the loop on the end of the Cable onto the hook of the Eyebolt. Align These Holes 40 16 50 51 35 e. a 2 _/ 38 58 37 52 51 35 49 52 Slot 1 36 39 11