Weider Pro 900 Bench English Manual - Page 9

the Leg Lever 4 and the Front Leg 8. Slide two

Page 9 highlights

11. Slide the Curl Post (27) into the Front Leg (8). 11 Align one of the adjustment holes in the Curl Post with the adjustment hole in the Front Leg. Tighten the M10 x 48mm Adjustment Knob (41) into the adjustment hole in the Front Leg. Make sure to fully tighten the Adjustment Knob. 27 12. Tap two 3/4Ó Round Inner Caps (9) into each Pad Tube (10). Insert the Pad Tubes into the holes in 12 22 the Leg Lever (4) and the Front Leg (8). Slide two Foam Pads (22) onto each Pad Tube. 8 41 13. Locate the Cable (34) and note that it has a loop on one end and a ball on the other end. Insert the 13 end with the loop through the slot in the Lat Tower (26) from the direction shown. Next, lay the Cable (34) in the groove of the Pulley (29). Attach the Pulley inside the slot in the Lat Tower (26) with an M10 x 65mm Bolt (18), two M10 Washers (24), two Wide Spacers (47), and an M10 Nylon Locknut (19). Press a 50mm Square Inner Cap (44) into the top of the Lat Tower (26). Attach a Cable Clip (33) to indicated end of the Cable (34). 14 14. Press a 1Ó Round Inner Cap (23) into the weight tube on the Weight Carriage (32). Insert the M10 x 19mm Bolt (46) into the bracket on the Weight Carriage (32) from the indicated direction. Note the position of the Lat Tower (26) in step 13. The Lat Tower must be positioned in this manner. Slide the Weight Carriage (32) onto the Lat Tower. Make sure that the Weight Carriage is oriented as shown. 9 10 4 8 9 10 9 10 22 44 18 24 33 47 29 24 34 19 26 26 Bracket 23 46 32

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

9
11.
Slide the Curl Post (27) into the Front Leg (8).
Align one of the adjustment holes in the Curl Post
with the adjustment hole in the Front Leg. Tighten
the M10 x 48mm Adjustment Knob (41) into the
adjustment hole in the Front Leg.
Make sure to
fully tighten the Adjustment Knob.
12.
Tap two 3/4± Round Inner Caps (9) into each Pad
Tube (10). Insert the Pad Tubes into the holes in
the Leg Lever (4) and the Front Leg (8). Slide two
Foam Pads (22) onto each Pad Tube.
13.
Locate the Cable (34) and note that it has a loop
on one end and a ball on the other end. Insert the
end with the loop through the slot in the Lat Tower
(26) from the direction shown.
Next, lay the Cable (34) in the groove of the
Pulley (29). Attach the Pulley inside the slot in the
Lat Tower (26) with an M10 x 65mm Bolt (18), two
M10 Washers (24), two Wide Spacers (47), and
an M10 Nylon Locknut (19).
Press a 50mm Square Inner Cap (44) into the top
of the Lat Tower (26).
Attach a Cable Clip (33) to indicated end of the
Cable (34).
14.
Press a 1± Round Inner Cap (23) into the weight
tube on the Weight Carriage (32).
Insert the M10 x 19mm Bolt (46) into the bracket
on the Weight Carriage (32) from the indicated
direction.
Note the position of the Lat Tower (26) in step
13. The Lat Tower must be positioned in this
manner.
Slide the Weight Carriage (32) onto the
Lat Tower.
Make sure that the Weight Carriage
is oriented as shown.
27
8
41
11
10
10
9
22
4
8
22
10
9
12
29
33
34
26
24
24
44
47
19
18
13
46
32
23
26
Bracket
14