Avanti DWF24V0W Install Manual - Page 5

Tools Which May Be Needed, Materials Which May Be Needed

Page 5 highlights

TOOLS WHICH MAY BE NEEDED MATERIALS WHICH MAY BE NEEDED (Additional materials may be required to comply with local codes) Hot Water Supply Line - Minimum 3/4" O.D. copper tubing or metal braided dishwasher supply line. UL listed conduit connector or strain relief. Shut-off valve and fittings appropriate for hot water supply line (copper tubing/compression fitting, or braided hose). Silicone Glue Silicone Glue 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

5
TOOLS WHICH MAY BE NEEDED
MATERIALS WHICH MAY BE NEEDED
(Additional materials may be required to comply with local codes)
Hot Water Supply Line - Minimum 3/4” O.D. copper tubing or metal braided
dishwasher supply line.
UL listed conduit connector or strain relief.
Shut-off valve and fittings appropriate for hot water supply line (copper
tubing/compression fitting, or braided hose).
Silicone Glue
Silicone Glue