Boss Audio 628BCK 609UAB_EN_UM.PDF - Page 4
Installation
![]() |
View all Boss Audio 628BCK manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
INSTALLATION Installation Procedures First complete the electrical connections and then check for correctness. Installation Opening This unit can be installed in any dashboard Having an opening as shown below. 7.20 inches 2.05 inches Insert mounting collar into the dashboard and bend the mounting tabs out with a screwdriver. Make sure that lock lever is flush with the mounting collar( not projecting outward). 2
![](/manual_guide/products/boss-audio-628bck-609uabenumpdf-8c124a9/4.png)
INSTALLATION
2
Installation Procedures
First complete the electrical connections and then check for correctness.
Insert mounting collar into the dashboard and bend the mounting tabs out with
a screwdriver.
Make sure that lock lever is flush with the mounting collar( not projecting outward).
Installation Opening
This unit can be installed in any dashboard Having an opening as shown
below.
2.05 inches
7.20 inches