Brother International BAS-311G Basic Instruction Manual - English - Page 20
Brother International BAS-311G Manual
View all Brother International BAS-311G manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
3. INSTALLATION 3-9. Connecting the cords 1. Gently tilt back the machine head. 2. Pass the cord bundle through the hole in the work table. 3. Loosen the two screws (1), and then open the cord presser plate (2) in the direction of the right arrow and pass the cord bundle through the opening. 4. Securely connect the connectors as indicated in the table below. NOTE: • Check that the connector is facing the correct way, and then insert it firmly until it locks into place. • Secure the cables with cable ties and cord clamps, while being careful not to pull on the connector. 4924Q NOTE: • Check that the connector is facing the correct way, and then insert it firmly until it locks into place. • Secure the cables with cable ties and cord clamps, while being careful not to pull on the connector. *1 : Be sure to make the ground connection. (Refer to "3-10. Connecting the ground wire".) Lock the cord clamp securely. Connector X pulse motor encoder 5-pin white Y pulse motor encoder 5-pin blue Work clamp pulse motor encoder 5-pin black Foot switch 10-pin Operation panel 8-pin Machine head switch 3-pin Home position sensor assembly 12-pin STOP switch 6-pin Valve harness 12-pin (pneumatic work clamp specifications) Programmer relay harness 8-pin Solenoid selection harness 4-pin Connection location on main PCB P20 (X-ENC) P4 (Y-ENC) P5 (P-ENC) P6 (FOOT) P1 (PANEL) P9 (HEAD-SW) P8 (SENSOR1) P13 (HEAD) P12 (AIR1) P7 (PRG) P3(CUTTER) Cord clamp (3) (3) (3) (3) (3) (4) (4) (4) (4) (3) - 1842B (Continued on next page) 12 BAS-300G, BAS-311G, BAS-326G