Brother International BAS-761 Instruction Manual - English - Page 12

Connection of the foot-switch connector, 3-5. Connection of the air hose, 3-6. Positioning

Page 12 highlights

3. Installation 3-4. Connection of the foot-switch connector Connect connector q securely. q 3-5. Connection of the air hose w q 1. Attach air hose q to air unit valve w. 2. Move the upper cap of air unit valve w upward and adjust the air pressure to 0.49 MPa. 3. After adjustment, move the cap downward and lock. 3-6. Positioning of the front supporter 1. Loosen bolts q and position front supporter w in the most appropriate position. 2. Tighten bolts q to secure the supporter w. w q 5 BAS-761

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47

5
BAS-761
Connect connector
q
securely.
3-4. Connection of the foot-switch connector
1.
Attach air hose
q
to air unit valve
w
.
2.
Move the upper cap of air unit valve
w
upward and ad-
just the air pressure to 0.49 MPa.
3.
After adjustment, move the cap downward and lock.
3-5. Connection of the air hose
q
w
1.
Loosen bolts
q
and position front supporter
w
in the
most appropriate position.
2.
Tighten bolts
q
to secure the supporter
w
.
3-6. Positioning of the front supporter
q
q
w
3. Installation