Cisco 4908G-L3 Installation Guide - Page 47
Installing the Switch, Verifying the Contents
UPC - 746320303703
View all Cisco 4908G-L3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 47 highlights
3 C H A P T E R Installing the Switch This chapter describes how to install the Catalyst 4900 series switch. For first-time installations, perform the procedures in the following sections in the order listed. • Verifying the Contents, page 3-1 • Rack-Mounting the Switch, page 3-2 • Connecting AC Power to the Switch, page 3-9 • Connecting DC Power to the Switch, page 3-11 Note Before starting the installation procedures in this chapter, complete the site planning checklist in Chapter 2, "Site Planning," to verify that all planning activities were completed. Verifying the Contents Note Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store them. You will need the container if you need to move or ship the switch in the future. 78-18039-02 Catalyst 4900 Series Switch Installation Guide 3-1