Cisco 4908G-L3 Installation Guide - Page 52
Quantity, Part Description, Received, Table 3-1, Rack-Mount Kit Checklist
UPC - 746320303703
View all Cisco 4908G-L3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 52 highlights
Rack-Mounting the Switch Chapter 3 Installing the Switch • Your own ESD grounding strap or the disposable ESD strap included with the system The following tools and equipment are required to install the chassis in a rack: • Rack-mount kit • Tape measure and level Rack-Mounting the Switch Note The illustrations shown are of a Catalyst 4948-10GE switch. The process for the Catalyst 4948 and Catalyst 4928-10GE is identical. Follow these steps to install the switch in a rack. Step 1 Prepare for installation: a. Place the chassis on the floor or on a sturdy table as close as possible to the rack. Leave enough clearance to allow you to move around the chassis. b. Use a tape measure to measure the depth of the rack. Measure from the outside of the front mounting posts to the outside of the rear mounting strip. The depth must be at least 19.25 inches (48.9 cm) but not greater than 32 inches (81.3 cm). c. Measure the space between the inner edges of the left front and right front mounting posts to ensure that it is 17.75 inches (45.09 cm) wide. (The chassis is 17.5 inches [44 cm] wide and must fit between the mounting posts.) d. Open the rack-mount kit, and refer to Table 3-1 to verify that all parts are included. Table 3-1 Rack-Mount Kit Checklist Quantity 2 8 Part Description L brackets M4 x 8 mm Phillips flat-head screws Received Catalyst 4900 Series Switch Installation Guide 3-6 78-18039-02