Compaq ProLiant 8500 Compaq Parallel Database Cluster Model PDC/O2000 for Orac - Page 110
Site Planning
View all Compaq ProLiant 8500 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 110 highlights
4-2 Compaq Parallel Database Cluster Model PDC/O2000 for Oracle8i and Windows 2000 Administrator Guide Site Planning You must carefully select and prepare the site to ensure a smooth installation and a safe and efficient work environment. To select and prepare a location for your cluster, consider the following: I The path from the receiving dock to the installation area I Availability of appropriate equipment and qualified personnel I Space for unpacking, installing, and servicing the computer equipment I Sufficient floor strength for the computer equipment I Cabling requirements, including the placement of network and Fibre Channel cables within one room (under the subfloor, on the floor, or overhead) and possibly between rooms I Client LAN resource planning, including the number of hubs or switches and cables to connect to the cluster nodes I Environmental conditions, including temperature, humidity, and air quality I Power, including voltage, current, grounding, noise, outlet type, and equipment proximity IMPORTANT: Carefully review the power requirements for your cluster components to identify special electrical supply needs in advance.