Dacor DRR36 Use and Care Manual - Page 30

Provision for Open Access to the Connected Product Requirements

Page 30 highlights

Operations Operations Provision for Open Access to the Connected Product Requirements 1. SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/) - Energy Consumption Reporting - Demand Response 2. OPEN API - Operational Status, User Settings & Messages - ICE Maker Status: GET /devices/0/Fridge/iceMaker - Door Open Alarm: GET /devices/0/Door//openState - DR Status: GET /devices/0/drlc - Delay Defrost Capability - Set Schedule of the Defrost Delay: PUT /devices/0/fridge//DefrostReservation - Get Schedule of the Defrost Delay: GET /devices/0/fridge//DefrostReservation - Delete Schedule of the Defrost Delay: DELETE /devices/0/fridge// DefrostReservation - Defrost Delay On/OFF: PUT /devices/0/Fridge/delayDefrost 30 English

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176

English
30
Operations
Operations
Provision for Open Access to the Connected Product Requirements
1.
SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/)
- Energy Consumption Reporting
- Demand Response
2.
OPEN API
-
Operational Status, User Settings & Messages
-
ICE Maker Status: GET /devices/0/Fridge/iceMaker
-
Door Open Alarm: GET /devices/0/Door/<<id>>/openState
-
DR Status: GET /devices/0/drlc
- Delay Defrost Capability
-
Set Schedule of the Defrost Delay: PUT /devices/0/fridge/<<id>>/DefrostReservation
-
Get Schedule of the Defrost Delay: GET /devices/0/fridge/<<id>>/DefrostReservation
-
Delete Schedule of the Defrost Delay: DELETE /devices/0/fridge/<<id>>/
DefrostReservation
-
Defrost Delay On/OFF: PUT /devices/0/Fridge/delayDefrost