Dell PowerEdge 2400 Installing Redundant Power Supplies - Page 7
Dell PowerEdge 2400 Systems, Installing Redundant Power Supplies, Power connector P2, Thumbscrew,
View all Dell PowerEdge 2400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 7 highlights
Thumbscrew Power connector P2 Power connector P3 Power Connector P1 10. Attach the 24-conductor cable labeled "PWR1" to connector P1 on the PSDB and connector POWER1 on the system board. 11. To attach the cable harness provided in the upgrade kit, perform the following steps: a. Attach the 18-pin connector labeled "PWR2" to connector P2 on the PSDB. b. Attach the 16-pin connector to the connector labeled "POWER" on the SCSI backplane board. c. Connect the remaining connectors on the cable harness to the diskette drive, tape drive, and other drives in the external drive bays. 12. Replace the top cover and secure it with the two screws. 13. Replace the two computer covers. 1. Using your thumb and index finger, squeeze the catch in the middle of the power supply handle (see Figure 1-3). 2. Rotate the handle downward. 3. Slide the power supply into the chassis (see Figure 1-3). Dell PowerEdge 2400 Systems - Installing Redundant Power Supplies 1-5