Dell PowerEdge PDU Metered LCD Cabling PowerEdge R710 - Page 5
Route the Power Cables Through the Strain Reliefs, 3 Routing the Cables Through the CMA
View all Dell PowerEdge PDU Metered LCD manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Cabling the Dell™ PowerEdge™ R710 2.2 Route the Power Cables Through the Strain Reliefs After the tray and cables are installed, route the power cables through the strain reliefs located on the power supply handles as shown in Figure 2. Figure 2: Routing Power Cables Through the Strain Reliefs 2.3 Routing the Cables Through the CMA NOTE: The CMA can be installed on either the right or left rear side of the rails. Mounting the CMA on the side opposite the power supplies (left side mount) is recommended; otherwise, the CMA must be disconnected in order to remove the outer power supply. Refer to "Replacing a Power Supply on a PowerEdge R710 with CMA" later in this white paper for details on power supply replacement. NOTE: For guidelines on how to route cables within the rack, refer to the Dell White Paper "Best Practices Guide for Rack Enclosure". Left Side Mounting Instructions 1. Install the CMA on the left rear side of the rails by attaching both CMA housings to the attachment brackets on the rails. See Figure 3. 2. Route the cables through the CMA while keeping any twisting of the cables to a minimum. If the cable bundle includes a KVM dongle, place the dongle inside the CMA basket. Use the hook and loop straps on the CMA to secure the cables. Page 3