Dell PowerEdge PDU Metered LCD Cabling PowerEdge R515 - Page 11
R515 System Installed in Static Rails
![]() |
View all Dell PowerEdge PDU Metered LCD manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Cable Routing Procedures for Dell™ PowerEdge™ R515 Systems Figure 10: Replacing the Outer Power Supply Disconnected inner CMA bracket Section 4: Cabling a PowerEdge™ R515 System Installed in Static Rails NOTE: The CMA is compatible with the sliding rails only, not the static rails. 1. Follow the instructions contained in the Rack Installation Instructions found in the static rail kit to install the server into a two-post or four-post rack. 2. Install the hook and loop straps provided in the rail kit through the slots in the rear brackets of the rails as described in the Rack Installation Instructions. 3. Connect all applicable cables to the rear of the system and verify that all connections are secure. 4. Using the hook and loop straps, bundle the cables and secure them to either the left rail or right rail as described in the Rack Installation Instructions. See Figure 11 for an example of data cables that are secured to the left rail and power cables that are secured to the right rail (as viewed from the rear of the system). Figure 11: Cabling a System Installed in Static Rails Page 9
![](/manual_guide/products/dell-poweredge-rack-enclosure-4820-cabling-poweredge-r515-b0240ea/11.png)