This rack kit is intended to be installed in a Dell rack by trained service technicians. If you install the kit in any other rack, be sure that the rack meets the specifications of the Dell rack. 5DFN6WDELOL]HU)HHW :$51,1*,QVWDOOLQJ'HOOV\VWHPVLQD'HOOUDFNZLWKRXWWKHIURQWDQG VLGHVWDELOL]HUIHHWLQVWDOOHGFRXOGFDXVHWKHUDFNWRWLSRYHUSRWHQWLDOO\ UHVXOWLQJLQERGLO\LQMXU\XQGHUFHUWDLQFLUFXPVWDQFHV7KHUHIRUHDOZD\V LQVWDOOWKHVWDELOL]HUIHHWEHIRUHLQVWDOOLQJFRPSRQHQWVLQWKHUDFN The stabilizer feet help to prevent the possibility of the rack tipping over when a Dell system or other components are pulled out of the rack so that the slide assemblies are fully extended. Refer to the Dell rack's installation guide for instructions on installing the stabilizer feet. 5DFN0RXQW6DIHW\*XLGHOLQHV In a rack-mount installation, follow these safety guidelines. :$51,1*$IWHULQVWDOOLQJ'HOOV\VWHPVLQDUDFNQHYHUSXOOPRUHWKDQRQH V\VWHPRXWRIWKHUDFNRQLWVVOLGHDVVHPEOLHVDWRQHWLPH7KHZHLJKWRI PRUHWKDQRQHH[WHQGHGV\VWHPFRXOGFDXVHWKHUDFNWRWLSRYHUDQGLQMXUH VRPHRQH &$87,218VHFDXWLRQZKHQSUHVVLQJWKHFRPSRQHQWVOLGHUHOHDVHODWFKHV DQGVOLGLQJDFRPSRQHQWLQWRRURXWRIDUDFNWKHVOLGHVFDQSLQFK\RXU ILQJHUV ‡ When installing a bridge in a closed or multirack assembly, ensure that the air temperature, measured at the front panel, does not exceed 35°C during operation. ‡ Ensure that the airflow to the bridge is unobstructed. ‡ Verify that the bridge installation, both with the slides closed and fully extended, does not unbalance the rack or exceed the rack's mechanical limits. ‡ Verify that the supply circuit, line fusing, and wire size are adequate. Refer to the bridge's nameplate for its power requirements. ‡ Verify that all equipment installed in the rack has a reliable ground connection. Do not rely on a connection to a branch circuit, such as a power strip. ‡ Route and support all cabling and the power cord to ensure that the bridge moves freely on its slide assemblies without crimping or damaging the power cord or interfering with other equipment and cabling installed in the rack. ‡ Always load the rack from the bottom up, and load the heaviest item in the rack first. 1-2 Dell PowerVault 35F Fibre Channel Bridge Rack Installation Guide

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50

1-2
Dell PowerVault 35F Fibre Channel Bridge Rack Installation Guide
This rack kit is intended to be installed in a Dell rack by trained service technicians. If
you install the kit in any other rack, be sure that the rack meets the specifications of
the Dell rack.
5DFN±6WDELOL]HU±)HHW±
:$51,1*±²,QVWDOOLQJ²’HOO²V\VWHPV²LQ²D²’HOO²UDFN²ZLWKRXW²WKH²IURQW²DQG²²²²²
VLGH²VWDELOL]HU²IHHW²LQVWDOOHG²FRXOG²FDXVH²WKH²UDFN²WR²WLS²RYHUµ²SRWHQWLDOO\²
UHVXOWLQJ²LQ²ERGLO\²LQMXU\²XQGHU²FHUWDLQ²FLUFXPVWDQFHV³²7KHUHIRUHµ²DOZD\V²
LQVWDOO²WKH²VWDELOL]HU²IHHW²EHIRUH²LQVWDOOLQJ²FRPSRQHQWV²LQ²WKH²UDFN³
The stabilizer feet help to prevent the possibility of the rack tipping over when a Dell
system or other components are pulled out of the rack so that the slide assemblies
are fully extended. Refer to the Dell rack's installation guide for instructions on
installing the stabilizer feet.
5DFN·0RXQW²6DIHW\²*XLGHOLQHV
In a rack-mount installation, follow these safety guidelines.
:$51,1*±²$IWHU²LQVWDOOLQJ²’HOO²V\VWHPV²LQ²D²UDFNµ²QHYHU²SXOO²PRUH²WKDQ²RQH²
V\VWHP²RXW²RI²WKH²UDFN²RQ²LWV²VOLGH²DVVHPEOLHV²DW²RQH²WLPH³²7KH²ZHLJKW²RI²
PRUH²WKDQ²RQH²H[WHQGHG²V\VWHP²FRXOG²FDXVH²WKH²UDFN²WR²WLS²RYHU²DQG²LQMXUH²
VRPHRQH³²
&$87,21±²8VH²FDXWLRQ²ZKHQ²SUHVVLQJ²WKH²FRPSRQHQW²VOLGH²UHOHDVH²ODWFKHV²
DQG²VOLGLQJ²D²FRPSRQHQW²LQWR²RU²RXW²RI²D²UDFN¶²WKH²VOLGHV²FDQ²SLQFK²\RXU²
ILQJHUV³
When installing a bridge in a closed or multirack assembly, ensure that the air
temperature, measured at the front panel, does not exceed 35
°
C during
operation.
Ensure that the airflow to the bridge is unobstructed.
Verify that the bridge installation, both with the slides closed and fully extended,
does not unbalance the rack or exceed the rack’s mechanical limits.
Verify that the supply circuit, line fusing, and wire size are adequate. Refer to the
bridge’s nameplate for its power requirements.
Verify that all equipment installed in the rack has a reliable ground connection. Do
not rely on a connection to a branch circuit, such as a power strip.
Route and support all cabling and the power cord to ensure that the bridge
moves freely on its slide assemblies without crimping or damaging the power
cord or interfering with other equipment and cabling installed in the rack.
Always load the rack from the bottom up, and load the heaviest item in the rack
first.