Dell S4148F-ON EMC PowerSwitch S4100–ON Series Installation Guide M - Page 28
S4100-ON Series installation, 1U front-rack installation
View all Dell S4148F-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 28 highlights
Figure 20. Four-post threaded installation 2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end. S4100-ON Series installation You can mount the switch in the 1U front-rack two-post, flush or center configuration, or a four-post configuration. The following is an example of a front-rack configuration: For the 1U two-post configurations, slide the switch into the rails in the same manner as the four-post configurations. 1U front-rack installation Configure the rails that are attached to the switch. 1. NOTE: For more information, see the installation instruction labels on the rail. Attach the inner switch rails to the S4100F-ON Series (S4128F-ON, S4148F-ON, S4148FE-ON, S4128T-ON, S4148T-ON, or S4148U-ON) switch. Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place. The following shows the detail of the front standoff with the locking tab: 28 S4100-ON Series installation