Dell S4148U-ON Networking S4100-ON Series Set-Up Guide - Page 12

Two-post flush-mount installation, flush-mount

Page 12 highlights

Figure 3. 1U tool-less installation 2 Align and seat the front flange pegs in the holes on the front side of the vertical post. NOTE: Be sure that the rails click into place and are secure. 3 Repeat this procedure for the second rail. 4 To remove each rail, pull on the latch release button on each flange ear and unseat each rail. Two-post flush-mount installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1 For this configuration, remove the latch castings from the front side of each ReadyRails assembly, item 1. To remove the two screws from each front flange ear on the switch side of the rail and remove each latch casting, use a Torx screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back flange castings. 12 S4100-ON Series installation

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21

Figure 3. 1U tool-less installation
2
Align and seat the front
flange
pegs in the holes on the front side of the vertical post.
NOTE:
Be sure that the rails click into place and are secure.
3
Repeat this procedure for the second rail.
4
To remove each rail, pull on the latch release button on each
flange
ear and unseat each rail.
Two-post
flush-mount
installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
For this
configuration,
remove the latch castings from the front side of each ReadyRails assembly, item 1.
To remove the two screws from each front
flange
ear on the switch side of the rail and remove each latch casting, use a Torx
screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back
flange
castings.
12
S4100–ON Series installation