Dell S4148U-ON Networking S4100-ON Series Set-Up Guide - Page 13

Two-post center-mount installation

Page 13 highlights

Figure 4. Two-post flush-mount installation 2 Attach one rail to the front post flange with two user-supplied screws, item 2. 3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws, see item 3. 4 Repeat this procedure for the second rail. Two-post center-mount installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws, item 1. S4100-ON Series installation 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21

Figure 4. Two-post
flush-mount
installation
2
Attach one rail to the front post
flange
with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange
with two user-supplied
screws, see item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post
flange
with two user-supplied
screws, item 1.
S4100–ON Series installation
13