Dell S4148U-ON Networking S4100-ON Series Set-Up Guide - Page 13
Two-post center-mount installation
View all Dell S4148U-ON manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 13 highlights
Figure 4. Two-post flush-mount installation 2 Attach one rail to the front post flange with two user-supplied screws, item 2. 3 Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two user-supplied screws, see item 3. 4 Repeat this procedure for the second rail. Two-post center-mount installation NOTE: For more installation instructions, see the installation labels attached to the rail assembly. 1 Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two user-supplied screws, item 1. S4100-ON Series installation 13
Figure 4. Two-post
flush-mount
installation
2
Attach one rail to the front post
flange
with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange
with two user-supplied
screws, see item 3.
4
Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post
flange
with two user-supplied
screws, item 1.
S4100–ON Series installation
13