Electrolux ECVI4262AS Complete Owners Guide English - Page 8

Caution, Warning, Important

Page 8 highlights

Removing the packaging CAUTION Remove the carton carefully. Wear gloves to protect against sharp edges. WARNING Remove the protective film covering the product before putting into operation. IMPORTANT Framing must be capable of supporting 150 lbs. Fig. 10 1/16" Ceiling Support Structures 7 1/16" This vent hood is heavy. Adequate structure and support must be provided in all types of installations. Framing must support minimum 150 Ibs load. At the hood location, adequate bracing is required to support the weight of the hood (fig. 2 ) Arrange cross framing in the ceiling to suit the existing structure (fig. 3 ) 10 1/16" Your ceiling joists will be like one of the following examples. Fig. 10 1/16" 7 1/16" 10 63/64" 7 1/16" 14 27/32" Front 10 1/16" 7 1/16" NOTE: Do not cut the duct opening shown on the template for the recirculating installation. 8 ENGLISH

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19

CAUTION
Remove the carton carefully.
Wear gloves to protect against sharp edges.
WARNING
Remove the protective film covering the
product before putting into operation.
8
ENGLISH
This vent hood is heavy. Adequate structure
and support must be provided in all types of
installations. Framing must support minimum
150 Ibs load.
At the hood location, adequate bracing is
required to support the weight of the hood (fig.
2
)
Arrange cross framing in the ceiling to suit
the existing structure (fig. 3
)
Your ceiling joists will be like one of the
following examples.
NOTE
: Do not cut the duct opening
shown on the template for the
recirculating installation.
IMPORTANT
Framing must be capable of supporting
150 lbs.
Fig.
Fig.
Ceiling Support Structures
Removing the packaging
7
1/16
"
10
1/16
"
10
63/64
"
14
27/32
"
Front
10
1/16
"
7
1/16
"
10
1/16
"
7
1/16
"
10
1/16
"
7
1/16
"