GE DCVH485EKMS Use and Care Manual - Page 24
Installation Instructions, FINAL SETUP, WARNING - 24 electric dryer
UPC - 084691191261
View all GE DCVH485EKMS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 24 highlights
FINAL SETUP Installation Instructions 1 LEVEL THE DRYER Stand the dryer upright near the final location and adjust the four leveling legs at the corners to ensure that the dryer is level from side to side and front to rear. 4 DRYER STARTUP Press the POWER button. Lower Raise 2 PLUG DRYER IN NOTE: Stacking installations may require a power cord up to 6 feet in length. Ensure proper ground exists before use. NOTE: If the dryer has been exposed to temperatures below freezing for an extended period of time, allow it to warm up before pressing POWER. Otherwise, the display will not come on. The dryer is now ready for use. SERVICING WARNING - Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation after servicing/installation. For replacement parts and other information, refer to the back cover for servicing phone numbers. 3 GROUNDING INSTRUCTIONS This appliance must be grounded. In the event of malfunction or breakdown, grounding will reduce the risk of electric shock by providing a path of least resistance for electric current. This appliance is equipped with a cord having an equipment-grounding conductor and a grounding plug. The plug must be plugged into an appropriate outlet that is properly installed and grounded in accordance with all local codes and ordinances. 24