GE GDT530PSDSS Installation Instructions - Page 5
Caution, PrecauciÓn - cleaning
View all GE GDT530PSDSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Installation Preparation PREPARE HOT WATER LINE • The line may enter from either side, rear or floor within the shaded area shown in Figure F. • The line may pass through the same hole as the electrical cable and drain hose. Or, cut an additional 1-1/2" diameter hole to accommodate the water line. If power cord with plug is used, water line must not pass through power cord hole. CAUTION: Do not remove wood base until you are ready to install the dishwasher. The dishwasher will tip over when the door is opened if base is removed. PRECAUCIÓN: No quite la base de madera hasta que esté listo para instalar el lavaplatos. Si se quita la base, el lavaplatos se volcará cuando se abra la puerta. 1-1/2" Dia. Shut-off Hole 4" Valve Hot 2" 6" From Cabinet 19" From Wall Cabinet Face 2" From Floor Figure F Water Line Connection • Turn off the water supply. • Install a hand shut-off valve in an accessible location, such as under the sink. (Optional, but strongly recommended and may be required by local codes.) • Water connection is on the left side of the dishwasher. Install the hot water inlet line, using no less than 3/8" copper tubing. Route the line as shown in Figure F and extend forward at least 19" from rear wall. • Adjust water heater for 120°F to 140°F temperature. • Flush water line to clean out debris. • The hot water supply line pressure must be 20-120 PSI. Turn page to begin dishwasher installation. 5