GE PSB1200NWW Installation Instructions - Page 5
Without
UPC - 084691188780
View all GE PSB1200NWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 5 highlights
Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING The Advantium 120V can be installed in combination with other GE/Monogram appliances. Always follow each product's Installation Instructions to complete the installation. Single Advantium 120V Installation: Order a 30″ wide single oven cabinet or cut the opening in a wall to the dimensions shown. 30″ 23-1/2″ 25-1/4″ 17-1/2″ Construct Base Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides • Allow 2-1/8″ case trim overlap on the sides, 1-1/16″ overlap on the top and 7/8″ overlap on the bottom of the opening for all models. • Oven overlaps will conceal cut edges on all sides of the opening. When installed over a single oven or a warming drawer, allow at least 2″ between the two openings. This separation will provide clearance for bottom overlap of the Advantium 120V and the other appliance overlaps. Construct a solid oven floor of 3/8″ min. thick plywood supported by 2 x 4 or 2 x 2 runners on all sides. • The support must be level and rigidly mounted, flush with the bottom edge of the cutout. PREPARE THE OPENING (cont.) Installation over a GE/Monogram Warming Drawer: 30″ 17-1/2″ 23-1/2″ 25-1/4″ Construct Solid Bottom Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides 2″ Min. (3″ Recommended) Per Warming Drawer Requirement NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. 5