Haier HPU-18CH13 HPU-123C01 User Manual - Page 27
Purging, Method, Tighten, torque
View all Haier HPU-18CH13 HPU-123C01 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 27 highlights
Installation Manual of Room Air Conditioner 3. Piping connection of the outdoor unit Connecting the connecting pipe and inlet and outlet liqued pipe according to the piping method. Purging Method: Push the air out of the indoor unit and piping as followes: (1) Remove the valve cap on 2-way valve in outdoor unit. (2) Loosen by 1/2 turn the flare nut of gas pipe, which is conneted to 3-way valve. (3) Loosen 2-way valve by 90o using hexagon wrench, and after approx. 6 sec tighten it up. Gas comes out through flare nut on wide pipe. If no gas is discharged, tighten flare nut with specified torque. (4) Open 2-way and 3-way valves using specified torque. (5) Tighten the caps on the valves with specified torque. Valve Tighten torque N.m 7-9 Valve 20-25 Liquid Side 2-way valve 06.35mm (1/41 Gas Side 3-way valve 012.7mm (1/2") L @.) Note: When additional refrigerant is necessary, first purge air out of connecting pipe by external gas, then drive out the excessive rerigerant by purging method Brand new unit is charged 80g more refrigerant than spec. This is only for first instaltion to purge air in the indoor unit and connecting pipe. 26