Haier QFT15ESSNWW Installation Instructions - Page 19
Installation Instructions, Final Setup
![]() |
View all Haier QFT15ESSNWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 19 highlights
ENGLISH INSTALLATION INSTRUCTIONS FINAL SETUP 1 LEVEL THE DRYER Stand the dryer upright near the final location and adjust the four leveling legs at the corners to ensure that the dryer is level from side to side and front to rear. 3 DRYER START-UP Press and hold the power button. NOTE: If the dryer has been exposed to temperatures below freezing for an extended period of time, allow it to warm up before pressing Power. Otherwise, the display will not come on. The dryer is now ready for use. Lower Raise 2 PLUG DRYER IN NOTE: Stacking installations may require a power cord up to 6 feet in length. WARNING - Electrical Shock Hazard Disconnect power supply before servicing. Replace all parts and panels before operating. Failure to do so can result in death or electrical shock. Ensure proper ground exists before use. 49-3000193 19
![](/manual_guide/products/haier-qft15essnww-installation-instructions-69b73ed/19.png)