HP Cluster Platform Hardware Kits v2010 HP ProCurve 2610 Series Rail Kit Insta - Page 7

Preparing for Installation, 1.1 Audience, 1.2 Documentation Resources

Page 7 highlights

1 Preparing for Installation 1.1 Audience This guide is intended for HP service representatives and other persons trained to install hardware options in HP 10000 Series racks. Such persons are expected to understand the hazards of working in this environment and to take suitable precautions to minimize danger to themselves and others. 1.2 Documentation Resources You can download the documentation for components referenced in this installation guide from the following locations: • HP 10000 Series Rack, (Documentation option): http://h18004.www1.hp.com/products/servers/proliantstorage/racks • High Performance Computing http://docs.hp.com/en/highperfcomp.html • ProCurve Networking http://www.hp.com/rnd/products/ 1.3 Overview of the Installation Procedure To install the HP ProCurve 2610 Series rail kit, follow these steps: 1. Verify kit contents 2. Orient the kit parts relative to the rack 3. Prepare for installation and gather required resources 4. Identify the installation location 5. Attach the support brackets to the rack 6. Attach the mounting brackets to the switch 7. Attach the assembled switch and mounting brackets to the rack The installation procedure should take no more than 15-20 minutes to complete. 1.4 Kit Description This document describes how to install the HP ProCurve 2610 Series rail kit in an HP 10000 series rack. This kit consists of a pair of mounting brackets that are attached to the HP ProCurve 2610 Series switch. These brackets are designed to stabilize an HP ProCurve 2610 Series switch in an HP 10000 series rack. The switch and mounting brackets are then attached to the rack itself. 1.5 Kit Contents Verify that your kit contains the following components: 1.1 Audience 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18

1 Preparing for Installation
1.1 Audience
This guide is intended for HP service representatives and other persons trained to install hardware
options in HP 10000 Series racks. Such persons are expected to understand the hazards of working
in this environment and to take suitable precautions to minimize danger to themselves and
others.
1.2 Documentation Resources
You can download the documentation for components referenced in this installation guide from
the following locations:
HP 10000 Series Rack, (
Documentation
option):
ers/proliantstorage/racks
High Performance Computing
ProCurve Networking
http://www
.hp.com/rnd/products/
1.3 Overview of the Installation Procedure
To install the HP ProCurve 2610 Series rail kit, follow these steps:
1.
Verify kit contents
2.
Orient the kit parts relative to the rack
3.
Prepare for installation and gather required resources
4.
Identify the installation location
5.
Attach the support brackets to the rack
6.
Attach the mounting brackets to the switch
7.
Attach the assembled switch and mounting brackets to the rack
The installation procedure should take no more than 15-20 minutes to complete.
1.4 Kit Description
This document describes how to install the HP ProCurve 2610 Series rail kit in an HP 10000 series
rack. This kit consists of a pair of mounting brackets that are attached to the HP ProCurve 2610
Series switch. These brackets are designed to stabilize an HP ProCurve 2610 Series switch in an
HP 10000 series rack. The switch and mounting brackets are then attached to the rack itself.
1.5 Kit Contents
Verify that your kit contains the following components:
1.1 Audience
7