HP DL760 HP ProLiant DL760 Generation 2 Server User Guide - Page 46
Rack Installation Overview, power supplies to lighten the chassis. - g2 power supply
UPC - 613326397428
View all HP DL760 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 46 highlights
Installing the Server in a Rack Rack Installation Overview Installing the ProLiant DL760 G2 server in a rack requires the following steps (detailed later in this chapter): 1. Select a site and unpack the server. Refer to the "Selecting a Site" and "Shipping Box Contents" sections in this chapter. 2. Remove the power supply and I/O module shipping brackets and the shipping screws. Refer to "Removing the Shipping Safeguards" later in this chapter. 3. Remove the processor and memory module, I/O module, media module, and power supplies to lighten the chassis. 4. Install any expansion boards or other options, such as additional memory. Refer to Chapter 4 and Chapter 5 to install many of the major options. NOTE: If the operating system is preinstalled on the server, refer to the Factory-Installed Operating System Software User Guide that is included with the server. 5. Install the chassis in the rack and replace the modules and power supplies. NOTE: Refer to the rack template included with the server for more details on installing the server in a rack. 6. Connect the following cables: keyboard, mouse, monitor, network, storage, and power. Refer to Chapter 6 for more information. 2-2 HP ProLiant DL760 Generation 2 Server User Guide