HP Integrity rx2620 Site Preparation Guide. First Edition - HP Integrity rx262 - Page 40

Delivery Survey Part 2, Please list number of flights and stairway dimensions.

Page 40 highlights

General Site Preparation Guidelines Delivery Survey Figure 2-3 Delivery Survey (Part 2) ELEVATOR Fill in the following information if an elevator is required to move equipment. Capacity (lb. or kg Depth Height Width Height Dept Widt STAIRS Please list number of flights and stairway dimensions. Number of flights Width Width Number of flights Width Width Widt Widt 40 Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43

General Site Preparation Guidelines
Delivery Survey
Chapter 2
40
Figure 2-3
Delivery Survey (Part 2)
ELEVATOR
Fill in the following information if an elevator is required to move equipment.
Capacity (lb. or kg) ________________
Depth ________________
Height ________________
Width ________________
Dept
Height
Widt
STAIRS
Please list number of flights and stairway dimensions.
Number of flights _____________________
Width ______________________
Width ______________________
Number of flights _____________________
Width ______________________
Width ______________________
Widt
Widt