HP Integrity rx5670 Site Preparation Guide - HP Integrity rx5670 (A6837B/A683 - Page 32
Sample of an Installation Schedule
View all HP Integrity rx5670 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 32 highlights
General Site Preparation Guidelines Sample of an Installation Schedule Sample of an Installation Schedule The following schedule lists the sequence of events for a typical system installation: • 60 days before installation - Floor plan design completed and mailed to Hewlett-Packard (if required to be an HP task) • 30 days before installation - Primary power and air conditioning installation completed - Telephone and data cables installed - Fire protection equipment installed - Major facility changes completed - Special delivery requirements defined - Site inspection survey completed - Delivery survey completed - A signed copy of the site inspection and delivery survey mailed to Hewlett-Packard - Site inspection and predelivery coordination meeting arranged with a Hewlett-Packard representative to review the inspection checklist and arrange an installation schedule. • 7 days before installation - Final check made with HP site preparation specialists to resolve any last minute problems NOTE Not all installations follow a schedule like the one noted above. Sometimes, an hp Integrity rx5670 is purchased through another vendor which can preclude a rigid schedule. Other conditions could also prevent following this schedule. For those situations, consider a milestone schedule. • Site Preparation-schedule with the customer as soon as possible after the order is placed. • Site Verification-schedule with the customer a minimum of one to two days before the hp Integrity rx5670 is scheduled to be installed. 32 Chapter 2