HP Integrity rx5670 Site Preparation Guide - HP Integrity rx5670 (A6837B/A683 - Page 33

Sample Site Inspection Checklist

Page 33 highlights

General Site Preparation Guidelines Sample Site Inspection Checklist Sample Site Inspection Checklist Table 2-4 Customer and Hewlett-Packard Information Customer Information Name: Phone No: Street Address: City: or Town: State or Province: Country: Zip or postal code: Primary customer contact: Phone No.: Secondary customer contact: Phone No.: Traffic coordinator: Phone No.: Hewlett-Packard information Sales representative Order No: Representative making survey Date: Scheduled delivery date Table 2-5 Site Inspection Checklist Please check either Yes or No. If No, include comment# or date Computer room No. Area or condition Yes No 1. Is there a completed floor plan? 2. Is there adequate space for maintenance needs? Front 36 in (91.4 cm) minimum, Rear 36 in (91.4 cm) minimum are recommended clearances. 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? 6. Is the raised floor adequate for equipment loading? Comment or Date Chapter 2 33

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46

General Site Preparation Guidelines
Sample Site Inspection Checklist
Chapter 2
33
Sample Site Inspection Checklist
Table 2-4
Customer and Hewlett-Packard Information
Customer Information
Name:
Phone No:
Street Address:
City:
or
Town:
State or Province:
Country:
Zip or postal code:
Primary customer contact:
Phone No.:
Secondary customer contact:
Phone No.:
Traffic coordinator:
Phone No.:
Hewlett-Packard information
Sales representative
Order No:
Representative making survey
Date:
Scheduled delivery date
Table 2-5
Site Inspection Checklist
Please check either Yes or No. If No, include comment# or date
Comment
or Date
Computer room
No.
Area or condition
Yes
No
1.
Is there a completed floor plan?
2.
Is there adequate space for maintenance needs?
Front 36 in (91.4 cm) minimum, Rear 36 in
(91.4 cm) minimum are recommended
clearances.
3.
Is access to the site or computer room
restricted?
4.
Is the computer room structurally complete?
Expected date of completion?
5.
Is a raised floor installed and in good condition?
6.
Is the raised floor adequate for equipment
loading?