HP Integrity rx5670 Site Preparation Guide - HP Integrity rx5670 (A6837B/A683 - Page 34
Table 2-5, Site Inspection Checklist Continued
View all HP Integrity rx5670 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 34 highlights
General Site Preparation Guidelines Sample Site Inspection Checklist Table 2-5 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date Comment or Date 7. Are there channels or cutouts for cable routing? 8. Is there a remote console telephone line available with an RJ11 jack? 9. Is a telephone line available? 10. Are customer supplied peripheral cables and LAN cables available and of the proper type? 11. Are floor tiles in good condition and properly braced? 12. Is floor tile underside shiny or painted? If painted, judge the need for particulate test. Power and lighting No. Area or condition Yes No 13. Are lighting levels adequate for maintenance? 14. Are there AC outlets available for servicing needs? (i.e. vacuuming) 15. Does the input voltage correspond to equipment specifications? 15A Is dual source power used? If so, identify type(s) and evaluate grounding. 16 Does the input frequency correspond to equipment specifications? 17. Are lightning arrestors installed inside the building? 18. Is power conditioning equipment installed? 19. Is there a dedicated branch circuit for equipment? 20. Is the dedicated branch circuit less than 250 feet (72.5 meters)? 21. Are the input circuit breakers adequate for equipment loads? Safety No. Area or condition Yes No 22. Is there an emergency power shut-off switch? 34 Chapter 2