HP Integrity rx7620 Site Preparation Guide, Fourth Editon - HP Integrity rx762 - Page 61

B-3, Footprint, Fully Extended, Server, 0 in., Service, Rack Front, With Ballasat

Page 61 highlights

General Site Preparation Guidelines Space Requirements The service area space requirements, shown in Figure B-3, are minimum dimensions. If other equipment is located so that it exhausts heated air near the cooling air intakes of the computer system cabinets, larger space requirements are needed to keep ambient air intake to the computer system cabinets within the specified temperature and humidity ranges. Figure B-3 Footprint Rear Anti-Tip Foot With Ballasat Rack Rear Service Area 24.0 in 58.8 cm 36.0 in 88.2 cm 53.0 in. 129.9 cm Rack Rack 36 in. Service Area Rack Front 36 in. 36.0 in. 88.2 cm Server (Fully Extended) Space planning should also include the possible addition of equipment or other changes in space requirements. Equipment layout plans should also include provisions for the following: • Channels or fixtures used for routing data cables and power cables • Access to air conditioning ducts, filters, lighting, and electrical power hardware • Power conditioning equipment • Cabinets for cleaning materials • Maintenance area and spare parts Appendix B 47

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83

Appendix B
General Site Preparation Guidelines
Space Requirements
47
The service area space requirements, shown in Figure B-3, are minimum dimensions. If other equipment is
located so that it exhausts heated air near the cooling air intakes of the computer system cabinets, larger
space requirements are needed to keep ambient air intake to the computer system cabinets within the
specified temperature and humidity ranges.
Figure B-3
Footprint
Space planning should also include the possible addition of equipment or other changes in space
requirements. Equipment layout plans should also include provisions for the following:
Channels or fixtures used for routing data cables and power cables
Access to air conditioning ducts, filters, lighting, and electrical power hardware
Power conditioning equipment
Cabinets for cleaning materials
Maintenance area and spare parts
(Fully Extended)
Server
88.2 cm
36.0 in.
58.8 cm
24.0 in
53.0 in.
129.9 cm
Service
Rack Front
36 in.
Area
36 in.
Rack
With Ballasat
Rear Anti-Tip Foot
Service
Rack Rear
Area
36.0 in
Rack
88.2 cm