HP Integrity rx7620 Site Preparation Guide, Fourth Editon - HP Integrity rx762 - Page 73

Appendix B, Please check either Yes or No. If No, include comment# or date, Comment, or Date

Page 73 highlights

General Site Preparation Guidelines Sample Site Inspection Checklist Table B-6 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date Comment or Date 23. Is there a telephone available for emergency purposes? 24. Is there a fire protection system in the computer room? 25. Is antistatic flooring installed? 26. Are there any equipment servicing hazards (loose ground wires, poor lighting, etc.)? Cooling No. Area or condition Yes No 27. Can cooling be maintained between 20 °C and 55 °C (up to 5000 ft.)? Derate 1 °C/1000 ft. above 5000 ft. and up to 10,000 ft. 28. Can temperature changes be held to 10 °C per hour with tape media? Can temperature changes be held to 20 °C per hour without tape media? 29. Can humidity level be maintained at 40% to 60% at 35 °C noncondensing? 30. Are air conditioning filters installed and clean? Storage No. Area or condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training No. Area or Condition 33 Are personnel enrolled in the System Administrator's Course? 34 Is on-site training required? Appendix B 59

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83

Appendix B
General Site Preparation Guidelines
Sample Site Inspection Checklist
59
23.
Is there a telephone available for emergency
purposes?
24.
Is there a fire protection system in the
computer room?
25.
Is antistatic flooring installed?
26.
Are there any equipment servicing hazards
(loose ground wires, poor lighting, etc.)?
Cooling
No.
Area or condition
Yes
No
27.
Can cooling be maintained between 20
°
C and
55
°
C (up to 5000 ft.)? Derate 1
°
C/1000 ft.
above 5000 ft. and up to 10,000 ft.
28.
Can temperature changes be held to
10
°
C per
hour with tape media? Can temperature
changes be held to 20
°
C per hour without tape
media?
29.
Can humidity level be maintained at 40% to
60% at 35
°
C noncondensing?
30.
Are air conditioning filters installed and clean?
Storage
No.
Area or condition
Yes
No
31.
Are cabinets available for tape and disc media?
32.
Is shelving available for documentation?
Training
No.
Area or Condition
33
Are personnel enrolled in the System
Administrator’s Course?
34
Is on-site training required?
Table B-6
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment# or date
Comment
or Date