HP Integrity rx7620 Site Preparation Guide, Fourth Editon - HP Integrity rx762 - Page 73
Appendix B, Please check either Yes or No. If No, include comment# or date, Comment, or Date
![]() |
View all HP Integrity rx7620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 73 highlights
General Site Preparation Guidelines Sample Site Inspection Checklist Table B-6 Site Inspection Checklist (Continued) Please check either Yes or No. If No, include comment# or date Comment or Date 23. Is there a telephone available for emergency purposes? 24. Is there a fire protection system in the computer room? 25. Is antistatic flooring installed? 26. Are there any equipment servicing hazards (loose ground wires, poor lighting, etc.)? Cooling No. Area or condition Yes No 27. Can cooling be maintained between 20 °C and 55 °C (up to 5000 ft.)? Derate 1 °C/1000 ft. above 5000 ft. and up to 10,000 ft. 28. Can temperature changes be held to 10 °C per hour with tape media? Can temperature changes be held to 20 °C per hour without tape media? 29. Can humidity level be maintained at 40% to 60% at 35 °C noncondensing? 30. Are air conditioning filters installed and clean? Storage No. Area or condition Yes No 31. Are cabinets available for tape and disc media? 32. Is shelving available for documentation? Training No. Area or Condition 33 Are personnel enrolled in the System Administrator's Course? 34 Is on-site training required? Appendix B 59
![](/manual_guide/products/hewlettpackard-integrity-rx7620-site-preparation-guide-editon-hp-integrity-rx7620-server-98116c7/73.png)