HP Integrity rx7620 Site Preparation Guide, Fourth Editon - HP Integrity rx762 - Page 74
Delivery Survey, Special delivery procedures
![]() |
View all HP Integrity rx7620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 74 highlights
General Site Preparation Guidelines Delivery Survey Delivery Survey The delivery survey forms list delivery or installation requirements. If any of the items on the list apply, enter the appropriate information in the areas provided on the form. Special instructions or recommendations should be entered on the special instructions or recommendations form. The following list gives examples of special instructions or issues: • Packaging restrictions at the facility, such as size and weight limitations • Special delivery procedures • Special equipment required for installation, such as tracking or hoists • What time the facility is available for installation (after the equipment is unloaded) 60 Appendix B
![](/manual_guide/products/hewlettpackard-integrity-rx7620-site-preparation-guide-editon-hp-integrity-rx7620-server-98116c7/74.png)
Appendix B
General Site Preparation Guidelines
Delivery Survey
60
Delivery Survey
The delivery survey forms list delivery or installation requirements. If any of the items on the list apply, enter
the appropriate information in the areas provided on the form.
Special instructions or recommendations should be entered on the special instructions or recommendations
form. The following list gives examples of special instructions or issues:
•
Packaging restrictions at the facility, such as size and weight limitations
•
Special delivery procedures
•
Special equipment required for installation, such as tracking or hoists
•
What time the facility is available for installation (after the equipment is unloaded)