HP Integrity rx7620 Site Preparation Guide, Fourth Editon - HP Integrity rx762 - Page 71
Sample Site Inspection Checklist, Table B-5, Customer and HP Information
![]() |
View all HP Integrity rx7620 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 71 highlights
General Site Preparation Guidelines Sample Site Inspection Checklist Sample Site Inspection Checklist Table B-5 Customer and HP Information Customer Information Name: Phone No: Street Address: City or Town: State or Province: Country Zip or postal code: Primary customer contact: Phone No.: Secondary customer contact: Phone No.: Traffic coordinator: Phone No.: HP information Sales representative Order No: Representative making survey Date: Scheduled delivery date Table B-6 Site Inspection Checklist Please check either Yes or No. If No, include comment# or date Computer room No. Area or condition Yes No 1. Is there a completed floor plan? 2. Is there adequate space for maintenance needs? Front 36 in (91.4 cm) minimum, Rear 36 in (91.4 cm) minimum are recommended clearances. 3. Is access to the site or computer room restricted? 4. Is the computer room structurally complete? Expected date of completion? 5. Is a raised floor installed and in good condition? 6. Is the raised floor adequate for equipment loading? Comment or Date Appendix B 57
![](/manual_guide/products/hewlettpackard-integrity-rx7620-site-preparation-guide-editon-hp-integrity-rx7620-server-98116c7/71.png)