HP J Class 3 HP Visualization Center sv6 - Installation and User's Guide and W - Page 36

installation process, <TABLE>, assessment

Page 36 highlights

installation and user information installation process installation process NOTE Table 2-5 36 Before attempting to install your hp visualization center sv6 system, please read the Safety Information in Chapter 1 of this document. This installation process assumes the following steps: Assessment Preparation for Wide Field Displays Workstation Installation Configuration Verification Thoroughly review the hp visualization center sv6 Site Prep Guide. Register an IP address and hostname for each workstation and Digi switch in the system. Take future upgrades into consideration. Confirm all system and display requirements with the vendor of your display(s) Order appropriate equipment and services Prepare site as recommended in the hp visualization center sv6 Site Prep Guide Locate and setup: • rack(s) of workstations • console monitors, keyboard, peripherals • cabling including power, network, etc. Configure workstations including passwords, networking, etc. Configure and calibrate any display options Locate and run verification test and demos assessment The assessment phase ensures that your computing needs are appropriately addressed. Options or future opportunities are considered at this stage so that system upgrade requirements are anticipated. 1. Review the hp visualization center sv6 Site Prep Guide to ensure that all space, power, cooling equipment handling requirements, etc. are understood. Take any future upgrades into consideration. For Chapter 2

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120

installation and user information
installation process
Chapter 2
36
installation process
NOTE
Before attempting to install your hp visualization center sv6 system,
please read the Safety Information in Chapter 1 of this document.
This installation process assumes the following steps:
assessment
The assessment phase ensures that your computing needs are
appropriately addressed. Options or future opportunities are considered
at this stage so that system upgrade requirements are anticipated.
1. Review the
hp visualization center sv6 Site Prep Guide
to ensure that
all space, power, cooling equipment handling requirements, etc. are
understood. Take any future upgrades into consideration. For
Table 2-5
Assessment
Thoroughly review the
hp visualization center sv6 Site Prep
Guide.
Register an IP address and hostname for each workstation
and Digi switch in the system.
Take future upgrades into consideration.
Confirm all system and display requirements with the vendor
of your display(s)
Preparation for
Wide Field
Displays
Order appropriate equipment and services
Prepare site as recommended in the
hp visualization center
sv6 Site Prep Guide
Workstation
Installation
Locate and setup:
rack(s) of workstations
console monitors, keyboard, peripherals
cabling including power, network, etc.
Configuration
Configure workstations including passwords, networking, etc.
Configure and calibrate any display options
Verification
Locate and run verification test and demos