HP J Class 3 HP Visualization Center sv6 - Installation and User's Guide and W - Page 53
step3: install, Actions, Add Targets, var/opt/sps/depots, OK] [OK], Show Software For Selection
View all HP J Class 3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 53 highlights
WARNING Chapter 2 installation and user information updating software (Actions) (Add Targets) Hostname: svm [Add] Target Depot Path: /var/opt/sps/depots [OK] [OK] (Actions) (Show Software For Selection) Source Host Name: svm Source Depot Path: /tmp/PHNE_25612.depot 9. In the software selection window: Left click to select PHNE_25612 Right click on PHNE_25612 (Mark for copy) (Actions) (Copy) Assign an optional job title for monitoring and reference purposes. Example: march gb [OK] Watch for warning or error messages that need to be resolved. (File) (Exit) step3: install When installing patches that require a reboot, switch to a stand-alone workstation X server instantiation. If you wish to use the SD GUI tools instead of the command line or terminal versions, either login remotely to perform the install, or configure the X server to run as it would on a stand-alone workstation. (Example: Temporarily move the /etc/X11/X0screens file to X0screens.save then restart the X server.) Failure to do this could result in an incomplete installation. On sv6, when the first slave node reboots, it kills the X server on the master node, which kills the remaining swinstall GUI windows. 10. Start install GUI: swinstall 11. In the target selection screen: 53