Chapter 1 troubleshooting your hp visualization center sv6 troubleshooting tree t Match labels on components to labels on cables. t Make sure all Power Distribution Units and power switches are ON. t On components that were recently worked on, reseat or tighten:  Cards  Thumb screws (large screws that fasten the Workstation cases)  Adapters  Connectors  PCI cages  Covers  Cables • Turn everything (including the Compositor) OFF, then back ON in this order: t Compositor t Master system t All hubs and network switch boxes t Slave systems 2. Installation Checklist Use this review to check the critical steps used to install the system at your site. It summarizes details given in the Installation section of the sv6 Installation/User's Guide. • Install optional display devices or other peripheral hardware for each Workstation. • To see what version of the X Window software you have and the build date, run: what /usr/bin/X11/X The build date should be May 30, 2001 or later and should be exactly the same on every Workstation in the visualization center. • For each machine, independently localize it with hostname, IP address, DNS, disk partitions and user. • Log ins, etc. - ensure function is correct and network connectivity is established before proceeding. Ping the other systems. Press Ctrl+C to stop. For example: ping 192.168.1.2 17

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36

troubleshooting your hp visualization center sv6
troubleshooting tree
Chapter 1
17
Match labels on components to labels on cables.
Make sure all Power Distribution Units and power switches are
ON.
On components that were recently worked on, reseat or tighten:
Cards
Thumb screws (large screws that fasten the Workstation cases)
Adapters
Connectors
PCI cages
Covers
Cables
Turn everything (including the Compositor) OFF, then back ON in
this order:
Compositor
Master system
All hubs and network switch boxes
Slave systems
2. Installation Checklist
Use this review to check the critical steps used to install the system at
your site. It summarizes details given in the Installation section of the
sv6 Installation/User’s Guide.
Install optional display devices or other peripheral hardware for each
Workstation.
To see what version of the X Window software you have and the build
date, run:
what /usr/bin/X11/X
The build date should be May 30, 2001 or later and should be exactly
the same on every Workstation in the visualization center.
For each machine, independently localize it with hostname, IP
address, DNS, disk partitions and user.
Log ins, etc. - ensure function is correct and network connectivity is
established before proceeding. Ping the other systems. Press Ctrl+C
to stop.
For example:
ping 192.168.1.2