HP Scitex FB7600 Essential Health and Safety Instructions Rev.C - Page 10

RIP and Networking Requirements, Miscellaneous

Page 10 highlights

RIP and Networking Requirements • RIP hardware • Network connection • Internet connection • Phone line for remote support • Call me @ HP preparations Miscellaneous • Distilled water for the UV cooler • All pre-installation preparations not specifically provided for in the sales contract. These may include the following: • Cost of building/modifications at the installation site, as applicable. • Booking the services of a specialist moving contractor (equipped with the required crane) to unload and move the equipment on the scheduled installation date. • All pre-installation work prior to delivery and installation of the system. • Final preparation and cleaning of the site prior to installation. • For better serviceability of the FB7600, a small 2-step ladder should be prepared, prior to installation, as shown below. Figure 1-1 2-Step Ladder 2-step ladder 2 HP Scitex Industrial Presses Essential Health and Safety Instructions

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52

2
HP Scitex Industrial Presses Essential Health and Safety Instructions
RIP and Networking Requirements
RIP hardware
Network connection
Internet connection
Phone line for remote support
Call me @ HP preparations
Miscellaneous
Distilled water for the UV cooler
All pre-installation preparations not specifically provided for in the sales
contract
. These may include the following:
Cost of building/modifications at the installation site, as applicable.
Booking the services of a specialist moving contractor (equipped with the
required crane) to unload and move the equipment on the scheduled
installation date.
All pre-installation work prior to delivery and installation of the system.
Final preparation and cleaning of the site prior to installation.
For better serviceability of the FB7600, a small 2-step ladder should be
prepared, prior to installation, as shown below.
Figure 1-1
2-Step Ladder
2-step ladder