Schedule:Develop, Delivery survey completed
View all HP Server rp7400 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 35 highlights
Develop the Schedule Develop the Schedule The following schedule lists the sequence of events for an ideal system installation. • 60 days before installation - Floor plan design completed and mailed to Hewlett-Packard • 30 days before installation - Primary power and air conditioning installation completed - Telephone and data cables installed - Fire protection equipment installed - Major facility changes completed - Special delivery requirements defined - Site inspection survey completed - Delivery survey completed - Signed copy of the site inspection and delivery survey mailed to Hewlett-Packard - Site inspection and predelivery coordination meeting arranged with a Hewlett-Packard Site Preparation Specialist to review the inspection checklist and arrange a solution delivery schedule. • Solution delivery date - Final check made with an Hewlett-Packard Site Preparation Specialist to resolve any last minute problems 35