HP StorageWorks 9000s NAS 4000s and 9000s Installation Guide - Page 36
to determine which nodes and storage devices should, be powered on during each step., Table 3
View all HP StorageWorks 9000s manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 36 highlights
Template date: 09/2003 DRAFT Use Table 3 to determine which nodes and storage devices should be powered on during each step. Table 3: Power Sequencing for Cluster Installation Step Setting up networks Setting up shared disks Verifying Disk Configuration Configuring the First Node Configuring the Second Node Post-installation Node 1 On On Off On On On Additional Nodes On Off On Off On On Storage Not Presented Presented Presented Presented Presented Presented Comments Verify that all storage devices on the shared bus are not presented. Power on all nodes. Shutdown all nodes. Present the shared storage, then power on the first node. Shut down first node, power on the next node. This process will need to be repeated for all cluster nodes. Shutdown all nodes; power on the first node. Power on the next node after the first node has been successfully configured. This process will need to be completed for all cluster nodes. At this point all cluster nodes should be on. 36 NAS 4000s and 9000s Installation Guide HP Restricted