Hotpoint NVLR223GGWW Installation Instructions - Page 3
Installation
View all Hotpoint NVLR223GGWW manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 3 highlights
Installation Instructions [] RECONNECTING GAS Listed connector ANSI Z21.24 / CSA 6.10 NEW METAL FLEXIBLEGAS LINECONNECTOR ADAPTER 3/8" NPT ELBOW ITEMSNOT SUPPLIED 118" NPT PIPE PLUG FOR GAS INLET PRESSURE SHUT-OFF PIPE SIZE AT LEAST 1/2" Note: The connector and fittings are designed for use onty on the original insta[tation and are not to be reused for another appliance or at another location. Keep flare end of adaptor free of ]rease, oi[ and thread sealant. Caution: Use adapters as shown. Connector nuts must not be connected directly to pipe threads. APPLYPIPECOMPOUND TO THEADAPTERAND DRYERGAS INLET. APPLYPiPECOMPOUND TOALL MALETHREADS. TIGHTEN ALL CONNECTIONS USING TWO ADJUSTABLE WRENCHES. DO NOT OVERTORQUE GAS CONNECTIONS! LEAK TEST [,_ WFLAARMNEINGTO T-ENSETVEFORRUGSAESANLEAOKPSE.N TIGHTEN THE FLEXIBLE GAS LINE USING TWO ADJUSTABLE WRENCHES. OPEN GASVALVE. Check alt connections for leaks with soapg solution or equivalent. Apply soap solution. Leak test solution must not contain ammonia which could cause damage to the brass fittings. If leaks are found, close valve, retighten the joint, and repeat the soap test. 3