Hunter 83001 Owner's Manual - Page 5

New Construction - attaching to joist - installation

Page 5 highlights

9 10 F C Pop out the first wiring access slug. Use second if needed. B Insert the strain relief (not Included) into the housing and secure with washer. Choose Installation Option For New Construction - attaching to joist go to step A11, page 5 For New Construction - suspended between joists go to step B11, page 8 For Existing Construction - accessible from above go to step C11, page 11 For Existing Construction - accessible only from below go to step D11, page 15 New Construction - attaching to joist A11 F A12 5/8 5/8 1/2 1/2 Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock. Screw pre-loaded screws into joist or framing. 5 41949-01 09/09/2011

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

41949-01
09/09/2011
5
9
F
Pop out the first wiring access slug. Use second if needed.
Insert the strain relief (not Included) into the housing
and secure with washer.
Position the correct depth mark at the bottom edge of the
joist based on the thickness of your sheetrock.
New Construction - attaching to joist
10
B
C
Choose Installation Option
For New Construction - attaching to joist go to step A11, page 5
For New Construction - suspended between joists go to step B11, page 8
For Existing Construction - accessible from above go to step C11, page 11
For Existing Construction - accessible only from below go to step D11, page 15
A11
F
5/8
1/2
5/8
1/2
A12
Screw pre-loaded screws into joist or framing.