Hunter 83001 Owner's Manual - Page 8

New Construction - suspended between joists

Page 8 highlights

New Construction - suspended between joists B11 B12 F E Slide the mounting rails into brackets. B13 5/8 1/2 5/8 1/2 Position the correct depth mark at the bottom edge of the joist based on the thickness of your sheetrock. B14 F Mark position of screws by using holes as a template. 1/8" bit Drill a hole in the center of each outline. B15 B16 Insert screws, leaving space between the screw head and the joist. Screws are not provided. 8 41949-01 09/09/2011 Attach the rails onto the screws.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

41949-01
09/09/2011
8
5/8
1/2
5/8
1/2
B12
Slide the mounting rails into brackets.
Mark position of screws by using holes as a template.
Insert screws, leaving space between the screw
head and the joist. Screws are not provided.
New Construction – suspended between joists
B11
E
F
1/8” bit
B14
B15
F
B13
Position the correct depth mark at the bottom edge of
the joist based on the thickness of your sheetrock.
Drill a hole in the center of each outline.
Attach the rails onto the screws.
B16