IBM 7979BEU User Manual - Page 89
serviceable
View all IBM 7979BEU manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 89 highlights
Installed power supplies Power supply 1 Power supplies 1 and 2 Statement 8: Required Fans in locations 3, 4, 8, 9, and 10 All 10 fans CAUTION: Never remove the cover on a power supply or any part that has the following label attached. Hazardous voltage, current, and energy levels are present inside any component that has this label attached. There are no serviceable parts inside these components. If you suspect a problem with one of these parts, contact a service technician. Hot-swap power supply 2 Power supply filler release lever Power supply filler To install an ac power supply, complete the following steps: Attention: In a dc power environment, only trained service personnel other than IBM service technicians are authorized to connect or disconnect power to the dc power supply and to install and remove a dc power supply. See the documentation that comes with each dc power supply for installation instructions. Chapter 2. Installing optional devices 73