IBM 86802SY Installation Guide - Page 10
Cabling Your Server, Continue with 5. Verifying Your Server Is Operating Properly
UPC - 087944496816
View all IBM 86802SY manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
4. Cabling Your Server Use the following procedure to attach the cables to your Netfinity 7000 M10. 1 Select a location that will allow for air circulation. Be sure to maintain minimum clearances around the server: Front Rear Left and Right Sides 306 mm (12 in.) 306 mm (12 in.) 51 mm (2 in.) 2 Connect the keyboard, mouse, and monitor cables to the server. For the location of cable connectors, refer to the illustration on the following page. Important If you are attaching a modem or fax machine to your server and you are in the United Kingdom, plug in the power cords first; then, connect the telephone line to the wall outlet and the server. To connect the server 10BASE-T or 100BASE-TX port to a hub, use a UTP cable with RJ-45 connectors at both ends. An EIA/TIA-568 category 5 cable must be used for 100BASE-TX connectors to meet various standards, including electromagnetic compatibility. 3 Connect the power cord to the server. 4 Connect all power cords to electrical outlets. 5 Continue with "5. Verifying Your Server Is Operating Properly" on page 10. 8 Netfinity 7000 M10 Express Setup and Installation